Penmann Climatic Systems Ltd was appointed by Premier Foods to deliver a permanent glycol chiller solution for the Ambrosia Creamery site in Lifton. The new system was designed to replace two temporary hire units and to enhance overall site efficiency, reliability, and cooling performance. The project scope included the design, https://www.penmann.co.uk/case-studies/glycol-chiller-project-ambrosia-creamery-lifton/