Place the initial plank With all the tongue aspect going through the wall. Push the top seam of the 2nd plank in the end seam of the very first plank, and after that lock them together by laying the plank down. Proceed Doing work still left to proper. WPC flooring https://www.trioflor.net/rigid-core-spc/